FEATURE FILMS

Apocalypto

Around the World in 80 Days

Saving Private Ryan

Assassins

Fahrenheit 451

Maverick

Dracula

Braveheart

We Were Soldiers
    APOCALYPT0

Director: Mel Gibson
Production Designer: Tom Sanders


Conceptual model for Apocalypto



    Production still from Apocalypto
    Production still from Apocalypto
    Production still from Apocalypto
    Production still from Apocalypto
    Production still from Apocalypto

        top
      Around the World in 80 Days

Conceptual work: Tom Sanders



Conceptual model for Around the World in 80 Days
      Conceptual model for Around the World in 80 Days
      Conceptual model for Around the World in 80 Days
      Conceptual model for Around the World in 80 Days
 
      SAVING PRIVATE RYAN

Director: Steven Spielberg
Tom Sanders: Production Designer




Conceptual model for Saving Private Ryan
      Location still from Saving Private Ryan
      Location still from Saving Private Ryan
      Conceptual model for beach landing, Saving Private Ryan
    Location still from Saving Private Ryan
   
        top
      ASSASSINS

Director: Richard Donner
Production Designer: Tom Sanders




Conceptual model for Assassins

      Conceptual model for Assassins
 
     

MAVERICK

Director: Richard Donner
Production Designer: Tom Sanders



Location still from Maverick

      Location still for Maverick
      Location still for Maverick
 
        top
      FAHRENHEIT 451

Director: Mel Gibson
Production Designer: Tom Sanders


Conceptual model for Fahrenheit 451
      Conceptual model for Fahrenheit 451
 
      DRACULA

Director: Francis Ford Coppola
Production Designer: Tom Sanders






Porduction still for Dracula
      Production still for Dracula
      Production still for Dracula
      Conceptual model for Dracula
      Production still from Dracula
 
      BRAVEHEART

Director: Mel Gibson
Production Designer: Tom Sanders



Location still from Braveheart

      Location still for Braveheart
      Location still from Braveheart
      Location still for Braveheart
 
      WE WERE SOLDIERS

Director: Mel Gibson
Production designer: Tom Sanders


Conceptual model from We Were Soldiers
     
Production still from We Were Soldiers
      Production still from We Were Soldiers (with conceptual model)

top