Resume

  • by-car ursapod

IMDb

Tom Sanders

 Representation

United Talent Agency
9336 Civic Center Dr. Beverly Hills, CA 90210 (TA-56599-1)
888 7th Ave 9th Floor New York, NY 10102 (DCA-2011819)

(310) 273 6700


 
PRODUCTION DESIGNER

2016 Star Trek Beyond
Director Justin Lin
2015 Crimson Peak
Director Guillermo del Toro
2013 The Redemption of Cain (pre-production)
Director Will Smith
2011-2012 After Earth
Director M. Night Shamalan
2011 Red Riding Hood
Director Catherine Hardwicke
2010 Secretariat
Director Randall Wallace
2010 Edge of Darkness
Director Martin Campbell
2008 Eagle Eye
Director DJ Caruso
2006 Apocalypto
Director Mel Gibson
2005 Rumour Has It…
Director Rob Reiner
2002 We Were Soldiers
Director Randall Wallace
2000 Mission Impossible II
Director John Woo
1998 Saving Private Ryan
Director Steven Spielberg
1997 Father’s Day
Director Ivan Reitman
1995 Assassins
Director Richard Donner
1995 Braveheart
Director Mel Gibson
1994 Maverick
Director Richard Donner
1992 Bram Stoker’s Dracula
Director Francis Ford Coppola

ART DIRECTOR

1991 Hook
1990 Naked Tango
1990 Days of Thunder
1990/91 Revenge

ART DEPARTMENT

2003 Timeline  visual consultant

DIRECTOR

1996 Tales from the Crypt (1 episode)
“About Face” TV episode